Execution Audit
Workflow Run #89
Full execution trace, ordered step results, duration metrics, and failure context.
Status
Succeeded
Trigger
Manual
Duration
4m 15s
Steps
8
Run Header
Execution Metadata
Summary
Workflow completed successfully.
Step Timeline
Ordered Execution Trace
1
Schedule Next 1 Day
schedule-next-day
Summary
Schedule next day synced. Games upserted: 12.
2
Completed Game Final Boxscore Sync
schedule-past-day
Summary
Past-day schedule and completed-game final boxscore sync finished. Games upserted: 12. Completed games synced: 4.
3
Player Snapshots
player-snapshots
Summary
Player snapshots built. Rolling=571, Relevance=532, Batch=0d5d0c75-1c3a-452b-8297-ade586e2c912, AsOf=2026-04-20 15:00:26Z.
4
ESPN Injuries
espn-injuries
Summary
ESPN injuries synced. Updated 122 player statuses.
5
Team Stats Snapshot
team-stats-snapshot
Summary
Team stats snapshot skipped. Suspicious team stats batch detected: all 30 comparable rows are identical to the latest existing batch for LastNGames=10. Sync aborted.
6
Daily Playoff Win Probability Snapshot
daily-playoff-win-probability-snapshot
Summary
Daily playoff win-probability snapshot built for 2026-04-20. RunId=14.
7
Historical Availability Daily States
historical-availability-daily-states
Summary
Historical availability daily states built for 169 missing eligible date(s) from 2025-10-20 through 2026-04-18. TeamContexts=2350; SnapshotsWritten=9999; LastSuccessfulBeforeRun=none; LatestEligible=2026-04-18; HistoricalFeedCoverageThrough=2026-04-19.
8
RotationState Daily Snapshots
rotation-state-daily-snapshots
Summary
RotationState daily snapshots built for 2026-04-18 through 2026-04-19. Days=2; TeamSnapshotsWritten=60; PlayerSnapshotsWritten=1340; LastSuccessfulBeforeRun=2026-04-17; LatestEligible=2026-04-19.
Execution Summary
Step Status Breakdown
Succeeded
8
Failed
0
Running
0
Skipped
0
Partial
0
Operator Notes
Reading This Run
Use the ordered timeline to identify the exact failure boundary.
Compare workflow summary vs step summary to isolate whether failure was orchestration-level or step-level.
Long durations usually indicate remote source latency or backfill-heavy sync execution.